ENEKOM · Rail safety

RailAcoustic®

The most advanced and precise broken rail detection system. TCDD approved, patented, active 24/7.

  • ERCI 2020 Award
  • 184 km+ Line Monitored
  • Rate: 99%

What We Do

One system, eight critical threats

Rail Break Hunter

Broken Detection

Broken rail detection to prevent train accidents and ensure safety

Crack Tracker

Crack Detection

Crack monitoring system to optimize maintenance planning and prevent failures

Flood Shield

Flood Detection

Flood detection for railways to protect infrastructure and ensure safety

Slope Guard

Landslide Detection

Landslide risk monitoring to prevent accidents and ensure safety

Rock Sentinel

Rockfall Detection

Rockfall detection system to enhance rail safety and prevent accidents

Void Radar

Track Bed Void Detection

Track bed void detection to ensure infrastructure safety and prevent derailments

Heat Watch

Temperature Anomaly

Temperature anomaly alerts to detect rail deformations early and ensure safety

Speed & ID

Train Speed Monitoring

Train speed & ID system to enhance operational efficiency currently in development

System Architecture

Four components, one safety chain

  1. RAG — Signal Generator

    RAG

    Signal Generator

    Applies a controlled acoustic signal to the rail.

  2. RAR — Receiver

    RAR

    Receiver

    Listens to the signal and echoes from defects up to 2 km in both directions.

  3. RASP — Trackside Panel

    RASP

    Trackside Panel

    Collects data and relays it to the control centre over fibre or RF.

  4. CCSM — Control Centre

    CCSM

    Control Centre

    Presents alarms, location and trends to the operator in real time.

How RailAcoustic® Works

The system analyses acoustic waves and detects broken rails within seconds.

RailAcoustic Workflow in 5 Steps

Every step, from manufacturing to field feedback, under one roof.

  1. Production01

    Production

    Acoustic sensing hardware and sensor components are manufactured for field conditions.

    Each component is quality-tested to meet industrial standards before deployment.

  2. Installation02

    Installation

    Sensors, data units, and power infrastructure are installed along the line in a planned layout.

    Cabling and connection points are optimized according to field conditions.

  3. Test & Signal03

    Test & Signal

    After installation, the system is validated through signal calibration and functional tests.

    Data from all sensor points is synchronized with the central system.

  4. Data Processing04

    Data Processing

    Collected acoustic data is analyzed in real time to derive potential anomaly patterns.

    AI algorithms classify the data and generate early warning alerts.

  5. Feedback05

    Feedback

    Outputs are delivered to operators, and the model is continuously improved with feedback.

    Operator feedback is fed back into the model to continuously improve accuracy.

Before & After

A revolution in railway safety with RailAcoustic®

Broken Rail Detection
Before
After

Manual patrol 1–2 times per week; detection delayed 24–72 hours

Instant automatic detection; notification within seconds

Kaydır
Inspection Duration
Before
After

4–6 hours of walking inspection per 90 km track

24/7 continuous monitoring, zero manpower needed

Kaydır
False Alarm Rate
Before
After

15–30% false alarms with manual methods

0% false alarms; TCDD-certified 99% accuracy

Kaydır
Cost
Before
After

High personnel, equipment, and transportation expenses

One-time installation, minimal operating cost

Kaydır
Weather Conditions
Before
After

Inspection cancelled or delayed in adverse weather

Works in all conditions; rain, snow, night — no difference

Kaydır
Data & Reporting
Before
After

Paper-based reports; no analysis possible

Real-time dashboard, historical data analysis, and trend reports

Kaydır

Technical Specifications

Sensor spacing
2 km (high-speed line) · 1 km (conventional / metro)
Self-diagnostic cycle
Every 10 seconds
Design speed
Up to 350 km/h
Operating temperature
−30 °C … +70 °C
Ingress protection
RASP IP65 · RAR / RAG IP67
Line type
AC, DC and non-electrified lines; independent of ballast resistance
Installation
No drilling or welding of the rail
Signalling
Does not interfere with existing signalling systems
RailAcoustic RAR

Completed and Ongoing Projects

Length: 90 km (double track)Date: 2018 – 2019

Ankara-Konya High-Speed Line

Features: Broken rail detection, train speed. Completed under contract with TCDD. System active with 99% accuracy.

Final acceptance was granted on 31 January 2019 after a live test in which the rail was cut at a randomly chosen point.

Length: 37 km (double track)

Yerköy-Sivas Line

Features: Vibration monitoring, remote alerting. First deployment on conventional lines.

Length: 184 km

184 km Fast Line (Active)

Features: Broken rail, wheel irregularity, rail temperature, flood/landslide monitoring. Continuously active.

2024-2025

Rail Drone: Autonomous Anomaly Detection with Image Processing

Autonomous detection of various defects on rail lines.

Total: 184 km

Active Line Length

Continuously monitored high-speed and conventional lines.

Rate: 99%

Detection Accuracy

Zero false alarms. TCDD approved.

Total: 6

Patent Count

Domestic and national technology, internationally patented.

Duration: 10+ Years

Industry Experience

A leading developer in railway safety.